/// `moonopt` command line interface.
///
/// It runs the built-in demos and prints a report for each one, covering every status the
/// public entry point can return — `Optimal`, `NodeLimit`, `Unbounded`, and the `NotSolved`
/// boundary, where the run cannot prove an answer and says so instead. A CLI that only ever
/// shows successes would be hiding the boundary the library documents. Model files,
/// certificates and the benchmark entry point live in the `parse` command (`cmd/parse`);
/// this one stays a runnable entry point that needs no arguments or data files.
///
/// Run with: `moon run cmd/main`
///|
/// Reported version string. Kept in sync with `moon.mod` by hand until the CLI
/// grows a real release command.
let version : String = "0.6.0"
///|
/// Prints a solve result in a stable, greppable format.
fn report(
title : String,
names : Array[String],
sol : @moonopt.Solution,
) -> Unit {
println("== " + title)
println("status : " + status_name(sol.status))
println("iterations : " + sol.iterations.to_string())
// The three numbers below mean something whenever there is an answer or a bound to
// report: for a linear solve the objective is its own bound and the gap is zero, for a
// branch and bound run on a budget they are what says how much is still open.
if sol.status == @moonopt.SolveStatus::Optimal ||
sol.status == @moonopt.SolveStatus::NodeLimit {
println("nodes : " + sol.nodes.to_string())
println("bound : " + sol.bound.to_string())
println("gap : " + sol.gap.to_string())
// `objective` means something only alongside a point: a budget that ran out before the
// search stood on one reports zero there, and printing that zero as an objective is
// how a failed run comes to look like an answer.
if sol.values.length() > 0 {
println("objective : " + sol.objective.to_string())
for i = 0; i < names.length() && i < sol.values.length(); i = i + 1 {
println(" " + names[i] + " = " + sol.values[i].to_string())
}
} else {
println("objective : (no integer point yet)")
}
} else {
println("message : " + sol.message)
}
println("")
}
///|
/// Human readable status name.
fn status_name(status : @moonopt.SolveStatus) -> String {
match status {
@moonopt.SolveStatus::Optimal => "Optimal"
@moonopt.SolveStatus::Infeasible => "Infeasible"
@moonopt.SolveStatus::Unbounded => "Unbounded"
@moonopt.SolveStatus::NodeLimit => "NodeLimit"
@moonopt.SolveStatus::NotSolved => "NotSolved"
}
}
///|
/// Demo 1: two-product production plan.
///
/// max 5x + 4y s.t. 6x + 4y <= 24, x + 2y <= 6, x, y >= 0 -> 21
fn production_plan() -> Unit {
let m = @model.Model::new(@model.Sense::Maximize)
let x = m.add_var("x")
let y = m.add_var("y")
m.set_objective([(x, 5.0), (y, 4.0)])
m.add_named_constraint(
[(x, 6.0), (y, 4.0)],
@model.Rel::LessEqual,
24.0,
"machine_hours",
)
m.add_named_constraint(
[(x, 1.0), (y, 2.0)],
@model.Rel::LessEqual,
6.0,
"labour_hours",
)
report("production plan", ["x", "y"], @moonopt.solve(m))
}
///|
/// Demo 2: minimum cost transportation with balanced supply and demand.
///
/// min 2a + 3b + 1c + 4d
/// s.t. a + b = 3, c + d = 2, a + c = 2, b + d = 3, all >= 0 -> 11
fn transportation() -> Unit {
let m = @model.Model::new(@model.Sense::Minimize)
let a = m.add_var("a")
let b = m.add_var("b")
let c = m.add_var("c")
let d = m.add_var("d")
m.set_objective([(a, 2.0), (b, 3.0), (c, 1.0), (d, 4.0)])
m.add_named_constraint(
[(a, 1.0), (b, 1.0)],
@model.Rel::Equal,
3.0,
"supply_1",
)
m.add_named_constraint(
[(c, 1.0), (d, 1.0)],
@model.Rel::Equal,
2.0,
"supply_2",
)
m.add_named_constraint(
[(a, 1.0), (c, 1.0)],
@model.Rel::Equal,
2.0,
"demand_1",
)
m.add_named_constraint(
[(b, 1.0), (d, 1.0)],
@model.Rel::Equal,
3.0,
"demand_2",
)
report("transportation", ["a", "b", "c", "d"], @moonopt.solve(m))
}
///|
/// Demo 3: an integer model, answered by the branch and bound.
///
/// `max 5x + 4y` with `6x + 4y <= 13` over whole `x, y` in `[0, 2]`: the relaxation fills
/// `y` to 2 and gives `x` what is left — 12.1667 — while the whole answer is 10 at
/// `(2, 0)`. The point of the demo is that the number printed is the second one, and that
/// nothing had to be said about relaxations to get it.
fn integer_plan() -> Unit {
let m = @model.Model::new(@model.Sense::Maximize)
let x = m.add_var("x", ub=2.0, is_int=true)
let y = m.add_var("y", ub=2.0, is_int=true)
m.set_objective([(x, 5.0), (y, 4.0)])
m.add_constraint([(x, 6.0), (y, 4.0)], @model.Rel::LessEqual, 13.0)
report("integer plan", ["x", "y"], @moonopt.solve(m))
}
///|
/// Demo 4: the same model on a node budget too small to finish.
///
/// The run says `NodeLimit` and hands back the two numbers that decide what to do next:
/// the best objective still reachable among the nodes left open, and how far the point it
/// has (if any) is from it. What it does not do is call the point an answer.
fn integer_plan_on_a_budget() -> Unit {
let m = @model.Model::new(@model.Sense::Maximize)
let x = m.add_var("x", ub=2.0, is_int=true)
let y = m.add_var("y", ub=2.0, is_int=true)
m.set_objective([(x, 5.0), (y, 4.0)])
m.add_constraint([(x, 6.0), (y, 4.0)], @model.Rel::LessEqual, 13.0)
report(
"integer plan on a one-relaxation budget",
["x", "y"],
@moonopt.solve_with(m, @moonopt.SolveOptions::with_max_nodes(1)),
)
}
///|
/// Demo 5: an integer model whose objective has no bound, and the proof of it.
///
/// `max x + y` with `x - y <= 3` over a whole `x` and a continuous `y`: nothing stops `y`
/// from growing. The relaxation is unbounded, and that alone proves nothing — but the
/// branch and bound holds an integral point `(0, 0)` and an integral improving ray
/// `(0, 1)`, so the run reports `Unbounded` rather than a relaxation's optimism.
fn unbounded_plan() -> Unit {
let m = @model.Model::new(@model.Sense::Maximize)
let x = m.add_var("x", lb=0.0, is_int=true)
let y = m.add_var("y", lb=0.0)
m.set_objective([(x, 1.0), (y, 1.0)])
m.add_constraint([(x, 1.0), (y, -1.0)], @model.Rel::LessEqual, 3.0)
report("unbounded plan", ["x", "y"], @moonopt.solve(m))
}
///|
/// Demo 6: the boundary — a relaxation that is unbounded but whose point is not whole.
///
/// `2x = 1` forces every feasible `x` to `0.5`, so there is no lattice point to start an
/// integral ray from. With `y` free in the objective the *relaxation* is unbounded, and the
/// run reports `NotSolved` rather than claiming the integer model is: an improving ray of
/// the relaxation need not carry lattice points, and this is the case that says so.
fn unbounded_relaxation_is_not_an_answer() -> Unit {
let m = @model.Model::new(@model.Sense::Maximize)
let x = m.add_var("x", lb=0.0, is_int=true)
let y = m.add_var("y", lb=0.0)
m.set_objective([(y, 1.0)])
m.add_constraint([(x, 2.0)], @model.Rel::Equal, 1.0)
report(
"unbounded relaxation, not an unbounded model",
["x", "y"],
@moonopt.solve(m),
)
}
///|
/// CLI entry point.
fn main {
println("moonopt " + version)
println("")
production_plan()
transportation()
integer_plan()
integer_plan_on_a_budget()
unbounded_plan()
unbounded_relaxation_is_not_an_answer()
}